Attention Drivers

NATIONAL GRID GAS PIPE INSTALLATION, ANCHOR LANE, COTUIT

May 4, 2021  National Grid, through their contractor Fraser Engineering, is planning on trenching across Route 28 on Tuesday, May 11th as part of their Anchor Lane (Cotuit) Regulator Station replacement project.  This work will require single lane closures on Route 28, which will last one evening.  Work is anticipated to be performed from 7:00 PM to 7:00 AM. 

Pre-work (i.e. saw-cutting) will take place on Wednesday, May 5 and Thursday, May 6, which will require portions of Anchor Lane travel lanes to be restricted, and work on Falmouth Road (Route 28) will include temporary lane closures, which will be controlled by police details. As always, please slow down and use extreme caution when traveling through the road construction areas, and follow posted safety and detour signs.