Friday October 7 – Sunday October 10
From Sandy Neck to Crocker Neck and Ponds in between
Take one of the many FREE guided walks and learn more about the beautiful Town of Barnstable
For more Information Click Here
Friday October 7 – Sunday October 10
From Sandy Neck to Crocker Neck and Ponds in between
Take one of the many FREE guided walks and learn more about the beautiful Town of Barnstable
For more Information Click Here
MassDOT and tree removal contractor (Northern Tree Service, Inc.) will be performing selective clearing and thinning on Rt.28, as indicated on the Project Notification Form. Work will begin between the hours of 7am – 3pm on September 26 for approximately 20 days.

ROAD SURFACE MILLING AND PAVING MAIN STREET, COTUIT
The Department of Public Works will be performing roadway improvements on Main Street in Cotuit (from Rt. 28 to Putnam Avenue) beginning on Friday, September 9, 2016. Improvements include milling of existing roadway surfaces, drainage system repairs, and new asphalt pavement surfaces. Work is expected to be completed by Friday, September 23, 2016, weather permitting.Vehicle access during construction operations will be restricted to one lane. Motorists are advised to seek alternate routes to avoid the construction work.
Operations will start promptly at 7 AM and run until 5 PM, after which time traffic will be opened back onto both lanes of the roadway.
As always, please slow down and use extreme caution when traveling through the road construction areas and follow posted safety signs.
CONTACT: JOE ORCIUCH Tel: 508-790-6400, Ext 4940
Click here to determine your voting location for today’s Primary
You must be logged in to post a comment.