ROAD WORK NOTICE

Road Construction

ROAD SURFACE MILLING AND PAVING MAIN STREET, COTUIT

The Department of Public Works will be performing roadway improvements on Main Street in Cotuit (from Rt. 28 to Putnam Avenue) beginning on Friday, September 9, 2016. Improvements include milling of existing roadway surfaces, drainage system repairs, and new asphalt pavement surfaces. Work is expected to be completed by Friday, September 23, 2016, weather permitting.Vehicle access during construction operations will be restricted to one lane. Motorists are advised to seek alternate routes to avoid the construction work.

Operations will start promptly at 7 AM and run until 5 PM, after which time traffic will be opened back onto both lanes of the roadway.

As always, please slow down and use extreme caution when traveling through the road construction areas and follow posted safety signs.

CONTACT: JOE ORCIUCH Tel: 508-790-6400, Ext 4940

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s