With no bubblers installed around the Cotuit Town Dock the prolonged freeze is beginning to take its toll and lifting the pilings!
The Red Sox have begun Spring training and soon our Cape Cod Baseball Leaguers will be back in action!
February 22, 2015 – This morning three DPW managers, including Director, Dan Santos, went to several roads and “plowed” them. There was a minimum amount of slush to plow. Not much melting had occurred and they each concluded that plowing would just leave a sheet of ice on the road. They have enough salt to make a 4 to 1 ratio of sand to salt and have decided to have crews sand/salt all the secondaries. This process should also take about eight hours to complete.
With the temperature expected to go well below freezing after today’s thaw, surface conditions will become slippery.
Take precautions when driving and walking.
Frostbite stages:
Hypothermia occurs when a person’s body temperature is below 96 degrees, and temperatures as low as 60 degrees can cause hypothermia if someone isn’t properly clothed.
Remember these tips to help prevent hypothermia:
February 16, 2015 5:15 AM – Good morning. DPW is back at work and back in all the secondary maps. Today’s plan is to make sure the secondary roads are pushed back to pre-storm levels and cleaned up. We also will be running the main roads again to push back any drifting. Sidewalk clearing will begin today, and we will have a few loaders out working to push back mounds on particularly bad corners.
NSTAR is now EVERSOURCE – Click Here for Map
You must be logged in to post a comment.